■ Africa / South AfricaCr · Pt

North West Chrome Project, South Africa

■ プロジェクトの詳細は現在、英語でのみ提供しています。

The project is in South Africa's North West Province, about 260 km in a straight line from Johannesburg, with road access. The first block holds a mining permit and is in production. The project company owns the full 3,000 ha of land, providing land access for potential expansion beyond the initial 4.92 ha.

[01プロジェクト概要]

Location
North West Province, South Africa; about 260 km from Johannesburg, with road access to the site
Commodity
Chromite with associated platinum group elements
Tenure
3,000 ha in total; a 4.92 ha first block holds a mining permit valid to 30 September 2029
Land ownership
The project company owns the full 3,000 ha of land
Seam thickness
1.8–2.2 m
Depth
10–150 m
Grade
36–40% Cr₂O₃; run-of-mine grade of 44–48% in parts
Resource potential
More than 100 Mt across the 3,000 ha
Mining method
Open-pit mining
Production
In production; planned run-of-mine output of 240,000 t in year two and 450,000 t a year from year three
Deal structure
Equity partnership, joint development or offtake, open to discussion

[02主な強み]

  • 01Already producing, with permits in place for the first block
  • 02Land and mineral tenure held by the same company, securing land for expansion
  • 03Shallow, consistent seam suited to open-pit mining
  • 04Associated PGEs can be recovered alongside chromite
  • 05Established mining legislation and property-rights framework in South Africa
01

Location and access

The project is in North West Province, about 260 km in a straight line from Johannesburg, with access to the road network. South Africa has an established mining and legal framework.

02

Mineralisation

The seam is 1.8–2.2 m thick at depths of 10–150 m, grading 36–40% Cr₂O₃, with run-of-mine grades of 44–48% in places. It is suited to open-pit mining.

Ten holes have been drilled to depths of about 15–56 m. Regional geology indicates platinum group elements associated with the chromite seam, adding value for combined recovery.

03

Production and expansion

The 4.92 ha first block holds a mining permit and is being mined by open pit, with planned run-of-mine output of 240,000 t in year two and 450,000 t a year thereafter.

A mining right over the full 3,000 ha can be applied for after completing the drilling programme (at least ten holes at a minimum spacing of 50 m), filing a Competent Person's Report, lodging the rehabilitation guarantee and obtaining approval from the minerals authority. At full development the plan is to produce 3 Mt a year of chrome concentrate grading above 44%.

04

Deal structure

Equity partnership, joint development and offtake arrangements can all be discussed, with the structure agreed to suit the investor.

[現地写真]

このプロジェクトについて問い合わせる

詳しい資料やご紹介をご希望の場合は、お問い合わせください。

このプロジェクトについて問い合わせる