■ Africa / MozambiqueTi · Zr

Mozambique Titanium–Zircon Heavy Mineral Sands Project

The project covers coastal and lateritic titanium–zircon heavy mineral sands in Mozambique, with more than ten targets in two mineralised belts. The sands are rich in titanium and zircon with associated monazite and are suited to open-pit mining. The project team has hands-on overseas experience in geology, drilling and sampling.

[01Project overview]

Location
Mozambique, East African coast
Commodity
Ilmenite, zircon, rutile, with associated monazite (rare earths)
Deposit type
Coastal and lateritic heavy mineral sands
Targets
More than ten heavy mineral sand targets in two mineralised belts
Resource
Most targets are in the hundred-million-tonne range
Mining method
Open pit with a low strip ratio
Stage
Target screening and exploration
Deal structure
Transfer of licences or project equity, joint development, exploration and technical services

[02Highlights]

  • 01Titanium, zircon and rare earth products from a single ore source
  • 02Shallow deposits with relatively straightforward mining and processing
  • 03In-house geology, drilling, sampling and assay team familiar with the difficulties of sampling heavy sands
  • 04Links to Chinese processing-plant manufacturers and downstream titanium, zircon and rare earth users
01

Resource characteristics

The coast of Mozambique is an important heavy mineral sands province in East Africa. Most targets combine high titanium and zircon with rare earth minerals, and can yield ilmenite, zircon, rutile and monazite concentrates.

The deposits are mainly coastal and lateritic, suited to open-pit mining with a low strip ratio and relatively simple processing.

02

Technical capability

The project team includes geologists, drillers, samplers and assayers with overseas field experience and its own exploration equipment. It can address common technical challenges in heavy mineral sands exploration, such as hardpan layers, hole collapse and sampling below the water table.

Shallow drilling is used to outline mineralisation and confirm resources quickly, allowing the more promising sites to be selected before title confirmation, plant construction and production.

03

Deal structure

Joint development: the project owner contributes licences, exploration expertise and local resources, while the partner funds mining, processing and operations.

Transfer of licences or equity: for sites where shallow drilling and a resource report have been completed, part or all of the interest can be transferred to mining companies and investors.

Technical services: drilling and sampling, geological exploration, on-site technical guidance and local operations support for mining companies entering the country.

[Site photos]

Enquire about this project

Contact us for more information or to arrange an introduction.

Enquire about this project